A Canadian subcontractor can be offside before a single meeting happens. It signs with a prime, the prime emails over a drawing package or a set of DO-178C requirements to scope the work, and at that moment the subcontractor has committed an offence under the Defence Production Act — not through carelessness, but because receiving controlled technical data before you are registered is the offence itself, not a formality you catch up on later.
Most Controlled Goods Program (CGP) guidance treats this as a compliance checkbox: register the company, register the people, done. What almost nobody writes about is what the CGP does to a certification program's evidence — who may open your PSAC, review your verification results, or sit in on a remote review of your coverage data. That is the gap this article fills.
Where the rule comes from, briefly
The short version explains why the rule is strict rather than bureaucratic: the United States revoked Canada's blanket ITAR exemption in 1999. Canada created the Controlled Goods Program in 2001, under the Defence Production Act, as the domestic regime that restored most of that access — largely through ITAR §126.5, which treats registered, vetted Canadian entities as an extension of a controlled US supply chain rather than a foreign one. The CGP is the price of that restoration, administered with the seriousness that history implies.
What actually triggers registration
Registration is mandatory before a person or company may examine, possess or transfer a controlled good — and technical data counts. That word is where engineering firms get caught, because a DO-178C program's most sensitive output is exactly that: technical data, not hardware. Requirements, design descriptions, source code, verification results — any of it can be controlled technical data if it relates to an item on Canada's controlled goods list.
The classic trap is the subcontractor path: an SME signs with a prime, the prime sends over drawings or requirements to define the scope of work, and the SME is offside from that email onward. Being a subcontractor does not inherit the prime's registration — every entity that will examine, possess or transfer the data needs its own.
The company, the individuals, and the plan
Registration is not a single form. The company needs a designated official accountable for compliance and a documented security plan describing how controlled goods and data are handled, stored and tracked. Individuals who will examine, possess or transfer controlled goods need their own security assessments first — often the pacing item, since it depends on people, not paperwork the company controls alone.
What this means for your DO-178C evidence
This is the part almost nobody writes about, and it is where a certification program actually feels the CGP. If your requirements, design data or verification results describe a controlled item, the evidence itself can be controlled technical data — reaching into ordinary certification workflow in ways easy to miss until they bite:
- Who may review it. A consultant — even a well-qualified one — needs to be authorized before opening your PSAC or verification results, not merely competent to read them.
- Where it is hosted. A document-sharing tool chosen for convenience, not access control, can put unregistered readers one shared link away from controlled data.
- How a remote review runs. An SOI-style review over screen-share with a mixed audience needs the same access discipline as a document repository — who is in the room, physically or virtually, matters as much as who has the file.
None of this is exotic engineering. It is access control applied to artifacts your verification team already produces — designed in, not retrofitted after a prime asks who has seen the data.
| Evidence artifact | What it typically shows | The handling question it raises |
| PSAC and verification plans | The certification approach and how evidence will be structured | Depends on the platform and contract — do they need enough system detail to become technical data themselves? |
| Requirements and design data | How the system behaves and how it is built | Commonly in scope on a defence platform — treat as controlled until told otherwise |
| Verification results and structural coverage data | Whether the software does what the requirements say | Often reveals implementation detail even when the requirements themselves are unclassified |
| Problem reports and CM history | What went wrong, why, and how it was fixed | Can expose design rationale — ask before sharing outside the registered team |
| Source and object code | The executable software itself | Frequently in scope by default; confirm before any external review |
The clock, and why it gates the start
Registration and the security assessments behind it take real calendar time — an administrative and personnel process, not a form filed the morning the data arrives. That is precisely why receiving controlled technical data before registration exists is the offence rather than a paperwork lapse: the program assumes registration happens before the need, not in response to it.
The practical consequence: treat Controlled Goods registration as a prerequisite to bidding, not a task inside the program plan. A prime that has already routed ITB obligations toward your firm (see our article on DO-178C on Canadian defence programs) will expect this to already be in place, the same way it expects your certification process maturity to already be in place.
Frequently asked questions
Can our US consultant review our evidence remotely?
It depends — and the dependency is the useful part. A US consultant reviewing Canadian controlled technical data sits on both the US export-control side and the Canadian Controlled Goods side; both regimes have to line up, not just one. Whether a remote review is permitted turns on the data's classification, how it is hosted, and whether the reviewer is separately authorized to receive export-controlled technical data. Confirm this in writing before scheduling the review, not after.
Does registration have to be in place before we sign the subcontract, or before we receive data?
The trigger is receiving, examining or transferring the data — not the signature. Primes routinely send scoping material, drawings or requirements alongside or before a signed subcontract, which is exactly how the classic trap happens. The safer posture: registration in place before any conversation involves technical detail, not merely before a signature.
We only do verification, not design — does this still apply to us?
Usually yes. Verification results and coverage data derived from controlled requirements or design are typically controlled in their own right — the obligation follows the data, not the role. A verification-only subcontractor handling controlled requirements needs its own registration exactly as a design subcontractor does.
If a prime's questionnaire has already raised controlled goods, or you are structuring evidence handling for a defence program for the first time, that is squarely inside what we do. See also our article on software certification with Transport Canada for the certification-authority side of the same program. Get in touch.